RM24,999.00 RM29,999.00
FW1285 FA Solar Photovoltaic PV Energy System Net Energy Metering NEM 4 KWp MELAKA
Price RM24,999.00 RM29,999.00
Product SKU product-1584763424083
Brand FASOLAR (Germany)
Size (L x W x H) 100 cm x 100 cm x 100 cm
Availability In Stock
Shipping Fee
Quantity
Description
Highlight
  • A NEM 4 kWp system is suitable if your monthly electricity bill is about RM300 - RM400 a month.
  • This system generates about RM260.00 a month of electricity saving.
  • Payback for FA NEM 4 kWp system is typically about 8 years.
  • FA tier 1 solar module supply provides 25 years of yield warranty and FA inverter has 10 years factory warranty.
  • FA provides 5 years service warranty for our installations.

 

FA Solar Photovoltaic PV Energy System Net Energy Metering NEM 4 kWp 

NEM is a self-consumption model, meaning we generate solar electricity for our own use. A NEM 4 kWp system is suitable if your monthly electricity bill is about RM300 - RM400 a month. This system generates about RM260.00 a month of electricity saving. Payback for FA NEM 4 kWp system is typically about 8 years.

 

FA tier 1 solar module supply provides 25 years of yield warranty, and FA inverter has 10 years factory warranty. FA provides 5 years service warranty for our installations.

 

Net Energy Metering (or, NEM)

The concept of NEM is that the energy produced from the solar photovoltaic PV system installed will be consumed first, and any excess to be exported and sold to the distribution licensee (such as TNB /SESB ) at the prevailing Displaced Cost prescribed by the Energy Commission. This scheme is applicable to all domestic, commercial and industrial sectors as long as they are the customers of TNB (Peninsular Malaysia) or SESB (Sabah and FT Labuan).

 

The more energy generated from the solar photovoltaic PV system is self-consumed; the more NEM consumers can save their electricity bills (by reducing the electricity imported from the utility). This is especially relevant for consumers that fall under the high electricity tariff block. The priority is for self-consumption, however some premises especially industry or manufacturing companies which may not be operating during the weekends may have excess energy exported to the grid. The credit shall be allowed to roll over for a maximum of 24 months and net-off at prevailing Displaced Cost. By generating their own clean energy, consumer will contribute to the reduction of CO2 emission, hence reducing the carbon foot print and mitigating climate change.

Reviews (0)
view all
back
0
0 reviews
What's in the box

FA Solar Photovoltaic PV Energy System Net Energy Metering NEM 4 kWp